NSW Reconstruction Authority

Northern Rivers Regional Disaster Waste Management Plan and Strategy

Talis was engaged by the NSW Reconstruction Authority to develop two critical documents: A Disaster Waste and Resource Recovery Management Plan and a separate Disaster Waste Management and Response Strategy for the Northern Rivers region of NSW.

Waste
Holcim Traffic Studies Engineering
Holcim Jandabup

Traffic Modelling

Holcim, a supplier of aggregates, concrete and concrete pipe and products, is proposing to extend its operating hours by an additional 2 hrs/ day.…
Engineering
Spatial Talis Consultants Banner
The WJ Graham Family Trust

Esperance Preliminary Site Investigations

Spatial was engaged by the Investigations team to create a set of figures to accompany their DWER compliant Preliminary Site Investigation report. These figures were required to establish the Sites history, environmental setting, and potential sensitive receptors in the Sites surrounds, and assess the potential risk to any receptors identified.

Spatial
Gascoyne Junction Bridges
Shire of Upper Gascoyne

Gascoyne Junction Bridges

Talis provided consultancy services for the planning of two bridges and a causeway across the Gascoyne River located at Gascoyne Junction. Talis was involved…
Engineering
Circular Economy
Main Roads Western Australia

Main Roads WA Circular Economy Plan

Talis was engaged in a collaborative process with Main Roads Western Australia (MRWA) to develop the Circular Economy Plan, providing a clear framework for embedding a ‘sustainability first’ approach across their operations and projects.

Waste
Big Swamp Storm water Drainage Analysis
City of Bunbury

Big Swamp Stormwater Drainage Analysis

Talis was engaged by the City of Bunbury to undertake a detailed investigation into its existing stormwater drainage network throughout the Big Swamp Catchment.…
Engineering