Talis assisted Albemarle with the development of its waste management strategy for its Lithium Plant in Kemerton. Talis commenced these works with analysis and projections of its current future waste streams. Based on these works, Talis devised a Waste Classification System for the life of the facility which has now been adopted into the day-to-day operations.
Talis devised a waste management contract for the operations phases of the facility and assisted with the evaluation of submissions. Talis is currently finalising the detailed design for a waste transfer station to be developed at the site.