Experience

Reset
Karratha Bridge Project
City of Karratha

Pedestrian and Cycle Bridges

Talis provided structural designs and technical specifications for seven (7) pedestrian footbridges with maximum span of 32m as part of the Shire of Karratha…
Engineering
Lutana Resource Recovery Centre
Southern Waste Solutions

Lutana Resource Recovery Centre

The redevelopment of the Lutana Resource Recovery Centre in Hobart, Tasmania, marks a significant milestone in the region’s environmental efforts. The 1980 square meter facility, valued at $4 million, was being developed for Southern Waste Solutions.

Engineering, Waste
Big Swamp Storm water Drainage Analysis
City of Bunbury

Big Swamp Stormwater Drainage Analysis

Talis was engaged by the City of Bunbury to undertake a detailed investigation into its existing stormwater drainage network throughout the Big Swamp Catchment.…
Engineering
Gascoyne Junction Bridges
Shire of Upper Gascoyne

Gascoyne Junction Bridges

Talis provided consultancy services for the planning of two bridges and a causeway across the Gascoyne River located at Gascoyne Junction. Talis was involved…
Engineering
Terminal 2 Forecourt Remediation Project
Perth Airport Pty Ltd

Terminal 2 Forecourt Remediation

Talis was commissioned by Perth Airport Pty Ltd to prepare detailed designs for the remediation and redesign of the Terminal 2 Forecourt. The existing…
Engineering
Parkes special Activation Precinct - Energy from Waste
Regional Growth NSW Development Corporation

Parkes Special Activation Precinct – EFW

Regional Growth NSW Development Corporation (RGDC) (Regional Growth NSW) is looking for suitably qualified and experienced consortia to fund, develop and operate a Materials Recovery Facility (MRF) and Energy from Waste (EfW) facility

Engineering, Waste