City of Wanneroo

Wangara Waste Transfer Station

Talis was engaged by the City of Wanneroo to lead planning and design works for repurposing an existing Material Recovery Facility into a Waste Transfer Station (WTS). This project is a key component of the City’s long-term waste management plan, transforming existing infrastructure to meet the community’s evolving needs.

Engineering, Waste
Terminal 2 Forecourt Remediation Project
Perth Airport Pty Ltd

Terminal 2 Forecourt Remediation

Talis was commissioned by Perth Airport Pty Ltd to prepare detailed designs for the remediation and redesign of the Terminal 2 Forecourt. The existing…
Engineering
Far North Collector Road Project
Shoalhaven City Council

Far North Collector Road

Talis provided consultancy services for the civil design to prepare concept designs for the proposed Far North Collector Road, linking Illaroo Road to Moss…
Engineering
Gascoyne Junction Bridges
Shire of Upper Gascoyne

Gascoyne Junction Bridges

Talis provided consultancy services for the planning of two bridges and a causeway across the Gascoyne River located at Gascoyne Junction. Talis was involved…
Engineering
Revitalisation of Burrendah Boulevard Canning City
City of Canning

Revitalisation of Burrendah Boulevard

Talis was engaged by the City of Canning to prepare detailed design documentation for the revitalisation of Burrendah Boulevard in front of Southlands Shopping…
Engineering
Lutana Resource Recovery Centre
Southern Waste Solutions

Lutana Resource Recovery Centre

The redevelopment of the Lutana Resource Recovery Centre in Hobart, Tasmania, marks a significant milestone in the region’s environmental efforts. The 1980 square meter facility, valued at $4 million, was being developed for Southern Waste Solutions.

Engineering, Waste