Experience

Reset
Revitalisation of Burrendah Boulevard Canning City
City of Canning

Revitalisation of Burrendah Boulevard

Talis was engaged by the City of Canning to prepare detailed design documentation for the revitalisation of Burrendah Boulevard in front of Southlands Shopping…
Engineering
Bayly Avenue Karratha Project
City of Karratha

Bayly Avenue Realignment

Bayly Avenue is the only public access into the Karratha Airport. Originally constructed in 1984, the road was in disrepair and required upgrade and rehabilitation.

Engineering
Talis Consultants Compliance Assessment Audit
Fortescue Metals Group (FMG)

Compliance Assessment/Audit

Talis was engaged by FMG to undertake compliance audits of their Iron Bridge, Eliwana Mine and Eliwana Rail Projects. These Projects required the development…
Environment
Gascoyne Junction Bridges
Shire of Upper Gascoyne

Gascoyne Junction Bridges

Talis provided consultancy services for the planning of two bridges and a causeway across the Gascoyne River located at Gascoyne Junction. Talis was involved…
Engineering
Pavement Assessment Project - City of Monash
City of Monash

Monash Paths

The City required a comprehensive condition survey and inventory update of it’s path network of 1500km length. Assessment was required to inform maintenance, renewal…
Assets
Spatial Talis Consultants Banner
The WJ Graham Family Trust

Esperance Preliminary Site Investigations

Spatial was engaged by the Investigations team to create a set of figures to accompany their DWER compliant Preliminary Site Investigation report. These figures were required to establish the Sites history, environmental setting, and potential sensitive receptors in the Sites surrounds, and assess the potential risk to any receptors identified.

Spatial